Location
|
Village Padyarna in District Kishtwar Union Territory of Jammu & Kashmir
|
Dam
|
109 m High Concrete Gravity Dam.
|
Water conductor system
|
Underground circular steel lined, 4 Nos., dia: 5.65 m (internal)
|
Power House
|
Underground – 4 units of 135 MW each (540 MW).
|
Tail Race Tunnel
|
2 nos, Length of TRT-1 is 2.7 km and Length of TRT-2 is 2.9 km, 9.5 m dia each.
|
Annual Energy
|
1975.54 MU in 90% dependable year.
|
Project Cost
|
Rs. 4526.12 Cr ( September 2020 Price Level).
|
Completion Period
|
54 months.
|
Tariff
|
First year – Rs. 4.07 per unit / Levellised Tariff – Rs. 4.44 per unit.
|